[电工技术] 巴西高压直流输电运行情况及启示

48 0
admin 发表于 2025-1-27 16:30 | 查看全部 阅读模式

巴西高压直流输电运行情况及启示
摘要:直流工程在巴西输电网中占据重要地位,建设和投运时间跨度大,工程运行、维护和管理考核具有本地特点。由于运维监管政策具有挑战性,巴西高压直流工程运维面临确保系统高可靠性和降低运营成本的双重压力。总体而言,背靠背直流工程整体运行情况良好,近年来的能量可用率一直维持在99%以上。从统计数据看,巴西长距离大容量直流输电工程的运行指标受不同设备运维状况影响大:阀和交流设备停电检修时间是影响工程能量可用率的主要原因;备品备件不足是导致换流变故障抢修时间延长的重要原因;长距离直流架空线路拉线塔比例高、线路维护任务重。中资企业丰富的特高压直流工程技术和管理经验有力地支撑了±800 kV 美丽山直流输电工程建设和运维,同时,工程实施需要应对中国和巴西两国管理体制、运营模式、标准体系等差异带来的特高压技术落地、入网和运行等方面的挑战。

Abstract:HVDC project occupy an important position in Brazilian transmission grid and the construction of the project and putting it into operation have been experienced a long period, and its operation, maintenance, management and assessment possess indigenous characteristics. Due to the challenging of the policy of the operation, maintenance and supervision, the operation and the maintenance of Brazilian HVDC project has to face with the double stresses from ensuing high reliability of the HVDC system and decreasing operating costs. In general, the overall operation situation of the back-to-back HVDC project is satisfied, and in recent years the energy availability have been stayed over 99 percent. According to statistical data, the operating indices of Brazilian long-distance high-capacity Itaipú and Madeira HVDC projects are obviously influenced by the operation and maintenance conditions of different equipments, in which the time of interruption maintenance for valves and AC equipments is the main reason effecting the energy availability, the shortage of spare parts is the important reason leading to prolong the time for urgent repair of the converter transformer failure, besides, there is a higher proportion of self-supporting towers in the long-distance HVDC overhead transmission line and the tasks of line maintenance are arduous. Although the extensive management experiences of Chinese funded enterprises in the field of HVDC transmission technology and management powerfully support the construction, operation and maintenance of ±800 kV Belo Monte HVDC project, however the project implementation still has to face with the challenges in UHVDC technology localization, integration into existing power grid and operation due to the differences in the aspects of management system, operation pattern and standard system between Brazil and China.

标题:巴西高压直流输电运行情况及启示
英文标题:Operation Situation of Brazilian HVDC Transmission Grids and Several Enlightenments

作者:刘云,

关键词:巴西电网, 高压直流输电工程, 运行和维护, 运行指标, 能量可用率,

发表日期:2021-02-07
2025-1-26 20:53 上传
文件大小:
1.27 MB
下载次数:
60
高速下载
【温馨提示】 您好!以下是下载说明,请您仔细阅读:
1、推荐使用360安全浏览器访问本站,选择您所需的PDF文档,点击页面下方“本地下载”按钮。
2、耐心等待两秒钟,系统将自动开始下载,本站文件均为高速下载。
3、下载完成后,请查看您浏览器的下载文件夹,找到对应的PDF文件。
4、使用PDF阅读器打开文档,开始阅读学习。
5、使用过程中遇到问题,请联系QQ客服。

本站提供的所有PDF文档、软件、资料等均为网友上传或网络收集,仅供学习和研究使用,不得用于任何商业用途。
本站尊重知识产权,若本站内容侵犯了您的权益,请及时通知我们,我们将尽快予以删除。
  • 手机访问
    微信扫一扫
  • 联系QQ客服
    QQ扫一扫
2022-2025 新资汇 - 参考资料免费下载网站 最近更新浙ICP备2024084428号
关灯 返回顶部
快速回复 返回顶部 返回列表