[能源与动力工程] 622MW级“W”火焰锅炉机组RB试验准备及分析

6 0
admin 发表于 2025-1-21 13:00 | 查看全部 阅读模式

622MW级“W”火焰锅炉机组RB试验准备及分析
摘要:以某新建2×622 MW机组工程为例,介绍了配置有正压双进双出磨煤机制粉系统,重油油枪及双旋风筒型燃烧器的W型火焰锅炉辅机故障快速减负荷功能(简称RB)的逻辑设置,试验前的准备性试验和注意事项。对每个试验过程进行了描述,对试验中存在的问题进行了分析,并据此对逻辑进行了优化,经优化后机组RB功能可正常投运,并在运行中动作正常可靠

Abstract:This paper introduces a Runback(Referred to as RB)function test carried out on a W Flame boiler unit,which is equipped with the double-inlet and double-outlet coal milling system,heavy fuel oil guns and double cyclone burners. It focuses on the logic function design,preparation test and test attentions.The process of RB function test has been described,analysis of the RB test data shows that there are some problems in the test process,and the corresponding solutions and logic optimization were presented,after then the RB function can be successfully conducted in practice. The realization of RB function would improve the operation security coefficient as well as the economic and social benefits.

标题:622MW级“W”火焰锅炉机组RB试验准备及分析
title:Preparation and Analysis of RB Test in a 622MW Thermal Power Plant with a W Flame Boiler

作者:张少勇, 罗昌福, 田平, 杨博闻
authors:ZHANG Shao-yong, LUO Chang-fu, TIAN Ping, YANG Bo-wen

关键词:双进双出,W型火焰,快速减负荷试验,试验准备,逻辑优化,重油,
keywords:double-inlet and double-outlet,W Flame,runback function test,preparation test,logic optimization,heavy fuel oi,

发表日期:2017-08-30
2025-1-21 00:12 上传
文件大小:
923.36 KB
下载次数:
60
高速下载
【温馨提示】 您好!以下是下载说明,请您仔细阅读:
1、推荐使用360安全浏览器访问本站,选择您所需的PDF文档,点击页面下方“本地下载”按钮。
2、耐心等待两秒钟,系统将自动开始下载,本站文件均为高速下载。
3、下载完成后,请查看您浏览器的下载文件夹,找到对应的PDF文件。
4、使用PDF阅读器打开文档,开始阅读学习。
5、使用过程中遇到问题,请联系QQ客服。

本站提供的所有PDF文档、软件、资料等均为网友上传或网络收集,仅供学习和研究使用,不得用于任何商业用途。
本站尊重知识产权,若本站内容侵犯了您的权益,请及时通知我们,我们将尽快予以删除。
  • 手机访问
    微信扫一扫
  • 联系QQ客服
    QQ扫一扫
2022-2025 新资汇 - 参考资料免费下载网站 最近更新浙ICP备2024084428号
关灯 返回顶部
快速回复 返回顶部 返回列表