[能源与动力工程] 基于主变PT二次回路升压试验的调试问题分析

8 0
admin 发表于 2025-1-21 13:00 | 查看全部 阅读模式

基于主变PT二次回路升压试验的调试问题分析
摘要:某2×600MW煤机电厂调试过程中,对#1主变电压互感器进行二次回路升压试验,试验期间发现第三个绕组的空开MCB9未合,却在其下口产生电压。经过多组加量分析后,发现问题并进行消缺,整改后对第三个绕组再次进行二次回路升压试验,试验结果正确无误,保证了调试进程。

Abstract:In the process of commissioning a 2*600MW Coal-fired power plant, The secondary circuit voltage test of # 1 main transformer voltage transformer was carried out. During the test it was found that the vacuum switch MCB 9 of the third winding was not closed,but A voltage is generated at the non-charged side of the switch. After a number of experimental analysis,the problem was found and solved. The secondary circuit voltage test of # 1 main transformer voltage transformer is carried out again. The test results are correct,ensuring the commissioning process

标题:基于主变PT二次回路升压试验的调试问题分析
title:Problems Analysis Based on the Secondary Circuit Voltage Test of the Main Transformer Voltage Transformer Commissioning Problem

作者:李振清, 沈量, 马党国
authors:LI Zhen-qing, SHEN Liang, MA Dang-guo

关键词:电气调试,电压互感器,二次回路,
keywords:electrical commissioning,voltage transforme,secondary circuit,

发表日期:2017-02-28
2025-1-21 00:10 上传
文件大小:
561.18 KB
下载次数:
60
高速下载
【温馨提示】 您好!以下是下载说明,请您仔细阅读:
1、推荐使用360安全浏览器访问本站,选择您所需的PDF文档,点击页面下方“本地下载”按钮。
2、耐心等待两秒钟,系统将自动开始下载,本站文件均为高速下载。
3、下载完成后,请查看您浏览器的下载文件夹,找到对应的PDF文件。
4、使用PDF阅读器打开文档,开始阅读学习。
5、使用过程中遇到问题,请联系QQ客服。

本站提供的所有PDF文档、软件、资料等均为网友上传或网络收集,仅供学习和研究使用,不得用于任何商业用途。
本站尊重知识产权,若本站内容侵犯了您的权益,请及时通知我们,我们将尽快予以删除。
  • 手机访问
    微信扫一扫
  • 联系QQ客服
    QQ扫一扫
2022-2025 新资汇 - 参考资料免费下载网站 最近更新浙ICP备2024084428号
关灯 返回顶部
快速回复 返回顶部 返回列表