摘要:摘要2020年9月30日,云南8 + 3风光项目落地,并出台配套的结构电价政策,即风电项目枯平期2 000 h以内采用燃煤发电上网基准电价,丰水期500 h以内采用集中交易撮合下限价格,超额部分执行竞争性电价,因此对云南结构电价下风电项目发电量评估方法提出了新的要求。基于该电价规则,以云南某个拟建设的风电项目为例,分析实测数据、中尺度数据的每年枯平期风速以及风功率密度、发电量占全年比值,对比采用不同机型计算枯平期发电量占比的变化;并采用长时间序列数据计算风电场枯平期发电量占比,与周边已建成风电场进行对比分析;提出云南结构电价下风电项目的枯平期发电量占比计算方法及项目评估建议。研究结果可为类似云南结构电价下的风电项目发电量评估提供依据。

Abstract::The 8 + 3 projects on wind and photovoltaic power were implemented in Yunnan on September 30, 2020, and the corresponding supporting structural electricity price policy was performed. Namely, the coal-fired power grid benchmark price was applied for wind power projects within 2 000 h of the dry flat period, and the floor price of centralized transaction matching was adopted within 500 h of the wet period, then the excess part was deemed as competitive electricity price. Therefore, new requirements are put forward for evaluation methods of wind power generation under Yunnan structural electricity price. Based on the electricity price rule, a wind farm planned to be built in Yunnan province was taken as an example to analyze the wind speed, wind power density, and energy generation ratio of measured data and mesoscale data in a dry flat period each year, and the change of energy generation ratio in dry flat period calculated by different models was compared. Long-term series data was used to calculate the power generation ratio of wind farms in the dry and flat periods and compared them with the surrounding wind farms. The calculation method and project evaluation strategy for the proportion of power generation in the dry and flat periods of Yunnan wind farms under structural electricity price were proposed. The research results can provide a basis for wind power generation evaluation under similar structural electricity prices in Yunnan.

中文标题:云南风电项目枯平期发电量占比计算方法探讨
英文标题:Calculation Method of Power Generation Ratio of Wind Farm in Yunnan During Dry Flat Period
发表时间:2022-07-22

作者:
马海鹏, 王芳, 梁会森, 刘瑞卿, 廖静, 刘诗琴, 赵斌
作者简介:
马海鹏(1992-),男,硕士,工程师,主要从事风资源评估方面的研究。赵 斌(1968-),男,博士,教授,博士生导师,主要从事工程热物理及先进发电技术等研究。

关键词:云南,风电场,枯平期,发电量占比,计算方法,
Key words:Yunnan,wind farm,dry flat period,power generation ratio,computing method,
2025-1-18 20:53 上传
文件大小:
5.08 MB
下载次数:
60
高速下载
【温馨提示】 您好!以下是下载说明,请您仔细阅读:
1、推荐使用360安全浏览器访问本站,选择您所需的PDF文档,点击页面下方“本地下载”按钮。
2、耐心等待两秒钟,系统将自动开始下载,本站文件均为高速下载。
3、下载完成后,请查看您浏览器的下载文件夹,找到对应的PDF文件。
4、使用PDF阅读器打开文档,开始阅读学习。
5、使用过程中遇到问题,请联系QQ客服。

本站提供的所有PDF文档、软件、资料等均为网友上传或网络收集,仅供学习和研究使用,不得用于任何商业用途。
本站尊重知识产权,若本站内容侵犯了您的权益,请及时通知我们,我们将尽快予以删除。
  • 手机访问
    微信扫一扫
  • 联系QQ客服
    QQ扫一扫
2022-2025 新资汇 - 参考资料免费下载网站 最近更新浙ICP备2024084428号
关灯 返回顶部
快速回复 返回顶部 返回列表