桩基施工期水下软土滑坡宏观分析
摘要:本文从宏观上对桩基施工期水下软土滑坡进行了分析,指出了水下滑坡可能出现的几种现象,分析了水下滑坡发展的全过程及其产生原因,介绍了预防水下滑坡的方法。
Abstract:The soft soil landslide under the water during the construction of pile foundation is analysed in macroscopic. Several phenomena may be occured during landslide is proposed. The whole developing procession of the landslide and the happening reasons are analysed. And the preventing method is produced in this paper.
中文标题:
桩基施工期水下软土滑坡宏观分析
Macroscopic Analyse of the Soft Soil Landslide under the Water During the Construction of Pile Foundation
作者:
杨峰1,韩善伦2
Yang Feng1,
通讯地址:
1 海军东海舰队勘测队; 2 舟山兴中石油转运有限公司
出版物:岩土工程技术
网络出版日期:2023-04-18
文档包含图片数量:图片(0)张
文档包含表格数量:表格(0)个
参考文献:
基金项目:
- 文件大小:
- 3.11 MB
- 下载次数:
- 60
-
高速下载
|
|