Abstract:Based on the acoustic wave sounding of the dam foundation of a water control project,the continuous ratio of J1~J4 inter layer shear zone is infered by analyzing the acoustic velocity anomaly.The reliability of fruits has been verified by the excavation of the dam foundation.