某地铁区间盾构隧道施工监测技术
摘要:地面的沉降监测与控制是地铁隧道盾构施工中最关键的问题,以某地铁盾构隧道施工监测技术为例,分析了监测的项目、方法、频率、报警值、控制标准、数据处理及反馈等技术,探讨了盾构施工过程地表沉降的影响因素及施工控制技术。研究结果对今后类似工程施工过程的施工监测及控制具有参考价值。
Abstract:The subsidence of the ground monitoring and control is the most critical issues in the subway tunnel shield construction. Based on a subway shield tunnel construction monitoring technology as an example, analyzes the monitoring project, method, frequency, alarm, control standard, data processing and feedback, such as technology, discusses the factors influencing the surface settlement of shield construction process and construction control technology. The research results in the process of construction of similar projects in the future construction monitoring and control has a reference value.
中文标题:
某地铁区间盾构隧道施工监测技术
A Subway Shield Tunnel Construction Monitoring Technology
作者:
孙建超,刘锦
Sun Jianchao,Liu Jin
作者简介:孙建超,男,1982年生,硕士,讲师,主要从事地铁施工、质量检测的教学与科研工作。E-mail:346482286@qq.con
通讯地址:
陕西铁路工程职业技术学院, 陕西渭南 714000
ShaanxiRailwayInstitute,Weinan714000,Shaanxi,China
中图分类号:U455.43
doi:10.3969/j.issn.1007-2993.2016.02.011
出版物:岩土工程技术
收稿日期:2016-01-15
关键词:盾构隧道,施工监测,地铁区间
Key words:shield tunnel,construction monitoring,the subway interval
文档包含图片数量:图片(0)张
文档包含表格数量:表格(0)个
参考文献:
基金项目:
- 文件大小:
- 715.01 KB
- 下载次数:
- 60
-
高速下载
|
|