[工业技术] 越南金瓯化肥项目真空预压监测成果分析

9 0
admin 发表于 2025-1-18 13:30 | 查看全部 阅读模式

越南金瓯化肥项目真空预压监测成果分析
摘要:越南金瓯化肥项目软基采用真空预压法处理,在预压过程中采用了膜下真空度、地面沉降、分层沉降、地下水位、孔隙水压力、深层水平位移等多种监测方法。对监测目的、方法做了介绍,根据监测的数据预测了最终沉降,计算了固结度,为卸载提供了依据。

Abstract:Vacuum preloading method is adopted in soft clay treatment of the design for Vietnam Ca Mau Fertilizer Project. Some monitoring methods is adopted in course of vacuum preloading, such as vacuum degree under membrane, ground settlement, layered settlement, groundwater level, pore water pressure and deep horizontal displacement. Monitoring objectives and methods are introduced. The final settlement under preloading and consolidation degree in every stage are also been calculated. Evidences for unloading are provided.

中文标题:
越南金瓯化肥项目真空预压监测成果分析
Analysis for Monitoring Results of Vacuum Preloading on Vietnam Ca Mau Fertilizer Project

作者:
甘七零
GAN Qiling
作者简介:甘七零,1971年生,男,汉族,广西平南人,高级工程师,主要从事岩土工程监测和检测方面的工作。
通讯地址:
化学工业岩土工程有限公司, 江苏南京 210044
ChemicalIndustryGeotechnicalEngineeringCo.,LtdNanjing210044,Jiangsu,China

中图分类号:TU447;TU449
doi:10.3969/j.issn.1007-2993.2010.02.002
出版物:岩土工程技术
收稿日期:2010-01-25
网络出版日期:2021-07-06


关键词:真空预压,固结度
Key words:vacuum preloading,consolidation degree
文档包含图片数量:图片(0)张
文档包含表格数量:表格(0)个

参考文献:

基金项目:


2025-1-17 22:51 上传
文件大小:
211.2 KB
下载次数:
60
高速下载
【温馨提示】 您好!以下是下载说明,请您仔细阅读:
1、推荐使用360安全浏览器访问本站,选择您所需的PDF文档,点击页面下方“本地下载”按钮。
2、耐心等待两秒钟,系统将自动开始下载,本站文件均为高速下载。
3、下载完成后,请查看您浏览器的下载文件夹,找到对应的PDF文件。
4、使用PDF阅读器打开文档,开始阅读学习。
5、使用过程中遇到问题,请联系QQ客服。

本站提供的所有PDF文档、软件、资料等均为网友上传或网络收集,仅供学习和研究使用,不得用于任何商业用途。
本站尊重知识产权,若本站内容侵犯了您的权益,请及时通知我们,我们将尽快予以删除。
  • 手机访问
    微信扫一扫
  • 联系QQ客服
    QQ扫一扫
2022-2025 新资汇 - 参考资料免费下载网站 最近更新浙ICP备2024084428号
关灯 返回顶部
快速回复 返回顶部 返回列表