土压平衡顶管法在DN 2400管道铺设中的应用
摘要:土压平衡顶管技术,在覆土厚度不低于0.8D的前提下,可安全地用于地下管道非开挖施工。作者以黄冈遗爱湖截污疏浚DN 2400管道工程——试验段(158m)土压平衡顶管的成功实践为例,对不良地质条件下(0.5~0.6D的低覆土厚度,素填土地层、局部杂填夹有块石和建筑垃圾等)大口径土压平衡顶管施工中地面变形控制等技术问题作以探讨。据初步了解,该工程的成功实践,目前在国内尚属首次。此施工案例的成功,有助于推动土压平衡式顶管技术的革新与进步,对今后类似工程具有一定的指导作用。
Abstract:Earth pressure balance pipe jacking technology, it can be safely used for soil as shallow as 0. 8 times of OD. The authors introduced Huanggang Yi-ai Lake interception in dredging DN 2400 pipeline -test section (158m) of earth pressure balance pipe jacking successful practice. Through cases, adverse geological conditions of large diameter earth pressure balance pipe jacking technologies such as ground deformation control issues to explore. At present there is not yet the successful practice of the project in China. The success of this case will help to promote the construction of earth pressure balance pipe jacking technology, innovation and progress, for future similar projects with some guidance.
中文标题:
土压平衡顶管法在DN 2400管道铺设中的应用
Application of EPB Jacking Pipe in DN 2400 Pipeline
作者:
刘永生,袁正中,马玄龙
LIU Yongsheng,YUAN Zhengzhong,MA Xuanlong
作者简介:刘永生,1973年生,男,汉族,河北髙阳人,硕士,工程师,主要从事地质工程(物探)和市政非开挖技术的应用研究与管理工作。E-mail:L_ysh@tom.com
通讯地址:
湖北省地球物理勘察技术研究院, 湖北武汉 430056
HubeiInstituteofGeophysicalProspectingTechnology,Wuhan430056,Hubei,China
中图分类号:TU991.02
doi:10.3969/j.issn.1007-2993.2010.05.011
出版物:岩土工程技术
收稿日期:2010-06-11
网络出版日期:2021-07-06
关键词:顶管,土压平衡式,低覆土厚度,地面变形控制
Key words:jacking pipe,earth pressure balance,shallow soil,ground deformation control