返回列表 发布新帖

[工业技术] 深基坑超挖施工围护结构变形分析

2 0
admin 发表于 2025-1-18 14:30 | 查看全部 阅读模式

深基坑超挖施工围护结构变形分析
摘要:在处于具有流变性土层的深基坑工程施工过程中,时有发生超挖未能及时设置支撑的现象,由于土的蠕变特性,导致围护结构变形急剧增大。通过弹粘塑性本构模型的二次开发,对软土地区深基坑施工过程中的正常开挖及时支撑和超挖两种情况进行数值模拟,分析深基坑围护结构变形随时间的变化规律及深基坑的安全性状,以达到有效控制基坑变形和保护周围环境的目的。

Abstract:During the excavation of foundation pit in rheological soil layer,the phenomena of over-excavation and support setting not timely occur frequently,and the characteristics of soft-soil creep,the deformation of retaining structures is increase sharply. With the secondary development program of the elastic-viscose-plastic constructive model,simulate the conditions of normal construction and over-excavation of foundation pit in Soft clay area,analyze the time change regulation of retaining structures and safety state of foundation pit,in order to achieve effective control of the deformation and protect the buildings adjacent to foundation pit.

中文标题:
深基坑超挖施工围护结构变形分析
Analysis on Deformation of Retaining Structures of Over-excavation in Foundation Pit

作者:
谢秀栋,王燕
Xie Xiudong,Wang Yan
作者简介:谢秀栋,1976年生,男,福建仙游人,博士,讲师,主要从事地下工程施工安全控制及其周边环境保护方面研究。E-mail:zlxxd@163.com
通讯地址:
福州大学土木工程学院, 福建福州 350108
CollegeofCivilEngineering,FuzhouUniversity,Fuzhou350108,Fujian,China

中图分类号:TU942
doi:10.3969/j.issn.1007-2993.2011.06.007
出版物:岩土工程技术
收稿日期:2011-09-28


关键词:基坑,软土蠕变,围护结构变形,数值模拟
Key words:foundation pit,soft-soil creep,deformation of retaining structures,numerical simulation
文档包含图片数量:图片(0)张
文档包含表格数量:表格(0)个

参考文献:

基金项目:
基金项目:    福建省自然科学基金资助项目(2009J05120)

2025-1-17 22:48 上传
文件大小:
495.47 KB
下载次数:
60
高速下载
【温馨提示】 您好!以下是下载说明,请您仔细阅读:
1、推荐使用360安全浏览器访问本站,选择您所需的PDF文档,点击页面下方“本地下载”按钮。
2、耐心等待两秒钟,系统将自动开始下载,本站文件均为高速下载。
3、下载完成后,请查看您浏览器的下载文件夹,找到对应的PDF文件。
4、使用PDF阅读器打开文档,开始阅读学习。
5、使用过程中遇到问题,请联系QQ客服。

本站提供的所有PDF文档、软件、资料等均为网友上传或网络收集,仅供学习和研究使用,不得用于任何商业用途。
本站尊重知识产权,若本站内容侵犯了您的权益,请及时通知我们,我们将尽快予以删除。
  • 手机访问
    微信扫一扫
  • 联系QQ客服
    QQ扫一扫
2022-2025 新资汇 - 参考资料免费下载网站 最近更新浙ICP备2024084428号
关灯 返回顶部
快速回复 返回顶部 返回列表