返回列表 发布新帖

[工业技术] 黄土洞室掘进深度与围岩位移变化规律研究

0 0
admin 发表于 2025-1-17 05:00 | 查看全部 阅读模式

黄土洞室掘进深度与围岩位移变化规律研究
摘要:应用PLAXIS 2D/3D有限元分析软件,对某黄土洞室进行了二维、三维分步掘进、三维一次掘进等工况的弹塑性有限元分析,研究分析了不同工况下洞室围岩位移的变化规律,并对掌子面的空间效应进行了分析。分析结果表明,二维与三维分步计算的最终位移基本一致,可以用二维的计算结果来估算洞室开挖的最终位移。三维分步掘进的分析表明,不同埋深的洞室其位移比的变化规律基本一致,当L/BL为掘进深度,B为洞室跨度),位移比呈线性增加;当L/B>1时,位移比呈非线性增加;当L/B>3时,其最大位移接近最终位移。掌子面的空间效应分析表明,在掌子面处的位移约为最终位移的1/3,距掌子面0.5倍跨度处的位移约为最终位移的2/3,距掌子面2.5倍跨度处的位移基本达到了最终位移。

Abstract:The elastoplastic finite element analysis of a loess cavern was carried out by two-dimensional, three-dimensional step-by-step excavation and three-dimensional one-shot excavation using PLAXIS 2D/3D finite element analysis software. The variation law in displacement of surrounding rock of cavern under different working conditions is analyzed, and the spatial effect of the tunnel face is analyzed. The analysis results show that the final displacement of the two-dimensional and three-dimensional step-by-step calculations is basically the same. Therefore, the two-dimensional calculation results can be used to estimate the final displacement of the cavern excavation. The analysis of three-dimensional step-by-step excavation shows that the displacement development of underground caverns with different depths is basically the same. When L/B≤1 (L is the tunneling depth and B is the tunnel span), the displacement ratio increases linearly. When L/B>1, the displacement ratio increases nonlinearly. When L/B>3, the maximum displacement is close to the final displacement. The spatial effect analysis of the tunnel face shows that the displacement at the tunnel face is about 1/3 of the final displacement. The displacement at a distance of 0.5 times span from the tunnel face is about 2/3 of the final displacement. The displacement at 2.5 times span from tunnel face is basically the final displacement.

中文标题:
黄土洞室掘进深度与围岩位移变化规律研究
Variation Law of Excavation Depth and Surrounding Rock Displacement of Loess Cavern

作者:
时卫民1,王鹏1,赵尚毅2
Shi Weimin1,Wang Peng1,Zhao Shangyi2
作者简介:时卫民,男,1967年生,河北灵寿县人,博士,一级注册结构工程师,主要从事建筑工程、边坡工程方面的设计和研究工作。E-mail:hhmswm@sina.com
通讯地址:
1. 32182部队, 北京 100043;    2. 重庆科技学院, 重庆 404100
1.No.32182BranchofthePLA,Beijing100043,China;    2.ChongqingUniversityofScienceandTechnology,Chongqing404100,China

中图分类号:U453.2
doi:10.3969/j.issn.1007-2993.2020.02.002
出版物:岩土工程技术
收稿日期:2019-05-13
网络出版日期:2021-07-10


关键词:黄土洞室,掘进深度,围岩位移,围岩压力释放率,有限元分析
Key words:loess cavern,excavation depth,displacement of surrounding rock,release rate of surrounding rock pressure,finite element analysis
文档包含图片数量:图片(0)张
文档包含表格数量:表格(0)个

参考文献:

基金项目:


2025-1-16 21:00 上传
文件大小:
1.21 MB
下载次数:
60
高速下载
【温馨提示】 您好!以下是下载说明,请您仔细阅读:
1、推荐使用360安全浏览器访问本站,选择您所需的PDF文档,点击页面下方“本地下载”按钮。
2、耐心等待两秒钟,系统将自动开始下载,本站文件均为高速下载。
3、下载完成后,请查看您浏览器的下载文件夹,找到对应的PDF文件。
4、使用PDF阅读器打开文档,开始阅读学习。
5、使用过程中遇到问题,请联系QQ客服。

本站提供的所有PDF文档、软件、资料等均为网友上传或网络收集,仅供学习和研究使用,不得用于任何商业用途。
本站尊重知识产权,若本站内容侵犯了您的权益,请及时通知我们,我们将尽快予以删除。
  • 手机访问
    微信扫一扫
  • 联系QQ客服
    QQ扫一扫
2022-2025 新资汇 - 参考资料分享下载网站 最近更新|网站地图浙ICP备2024084428号
关灯 返回顶部
快速回复 返回顶部 返回列表