白鹤滩水电站施工期谷幅变形监测分析
摘要:我国已建成的特高拱坝如溪洛渡、锦屏一级等,在初期蓄水过程中均表现出了谷幅收缩的异常现象,然而均没有对开挖卸荷期间谷幅变形情况进行观测研究。通过对白鹤滩水电站开挖期间谷幅变形监测进行分析,为同类型高拱坝变形监测提供相关参考依据,同时为后续蓄水初期谷幅变形监测分析提供相关基础保障。

Abstract:The super-high arch dams in China, such as Xiluodu and Jinping, have exhibited anomalous phenomenon of valley shrinkage during the initial impoundment. However, there is no observation on the deformation of the valley during excavation unloading. The deformation monitoring of the valley are analyzed during the construction period of Baihetan Hydropower Station, and provides relevant reference for the deformation monitoring of the same type of high arch dams. At the same time, it provides relevant basic guarantee for the monitoring and analysis of valley deformation in the initial stage of water storage.

中文标题:
白鹤滩水电站施工期谷幅变形监测分析
Monitoring and Analysis of Valley Deformation during Construction of Baihetan Hydropower Station

作者:
赵振军1,于胜利2
Zhao Zhenjun1,Yu Shengli2
作者简介:赵振军,男,1987年生,工程师,从事大坝安全监测与管理相关工作。E-mail:875795830@qq.com
通讯地址:
1. 中国长江电力股份有限公司, 湖北宜昌 443002;    2. 中国三峡建设管理有限公司, 四川成都 610042
1.ChinaYangtzePowerCo.,Ltd.,Yichang,443002,Hubei,China;    2.ChinaThreeGorgesProjectsDevelopmentCo.,Ltd.,Chengdu610042,Sichuan,China

中图分类号:TV221.2
doi:10.3969/j.issn.1007-2993.2020.02.008
出版物:岩土工程技术
收稿日期:2019-05-29
网络出版日期:2021-07-10


关键词:白鹤滩,施工期,谷幅,变形分析
Key words:Baihetan,construction period,valley deformation,deformation analysis
文档包含图片数量:图片(0)张
文档包含表格数量:表格(0)个

参考文献:

基金项目:


2025-1-16 21:00 上传
文件大小:
8.26 MB
下载次数:
60
高速下载
【温馨提示】 您好!以下是下载说明,请您仔细阅读:
1、推荐使用360安全浏览器访问本站,选择您所需的PDF文档,点击页面下方“本地下载”按钮。
2、耐心等待两秒钟,系统将自动开始下载,本站文件均为高速下载。
3、下载完成后,请查看您浏览器的下载文件夹,找到对应的PDF文件。
4、使用PDF阅读器打开文档,开始阅读学习。
5、使用过程中遇到问题,请联系QQ客服。

本站提供的所有PDF文档、软件、资料等均为网友上传或网络收集,仅供学习和研究使用,不得用于任何商业用途。
本站尊重知识产权,若本站内容侵犯了您的权益,请及时通知我们,我们将尽快予以删除。
  • 手机访问
    微信扫一扫
  • 联系QQ客服
    QQ扫一扫
2022-2025 新资汇 - 参考资料免费下载网站 最近更新浙ICP备2024084428号
关灯 返回顶部
快速回复 返回顶部 返回列表