摘要:在地下隧道施工中遇到既有桩的情况并不少见,尽管近年来隧道-土-桩相互作用引起了广泛关注,但以往的研究主要集中在小规模隧道开挖引起的桩的反应上。通过三维离心模型试验,研究了双管大型隧道开挖引起的群桩变形机理。由于隧道开挖引起的应力释放,群桩的实测沉降随隧道的推进几乎呈线性增加。监测点距新建隧道较短,导致群桩沉降较大。单隧道开挖完成后,在隧道中心线正上方观测到最大桩群沉降为0.23%D(即隧道直径)。双管开挖后,最大群桩沉降增加到0.32%D,最大群桩沉降位置向两隧道之间的中心线移动。随着开挖面接近监测断面,既有桩群迅速向开挖面倾斜。当隧道工作面通过监测断面时,减少了现有群桩的倾斜。显然,当隧道工作面位于监测断面正下方时,测得的群桩倾斜达到最大值。这清楚地说明了隧道开挖引起群桩的三维变形机理。若将隧道开挖简化为二维问题,则忽略了群桩沿隧道纵向的倾斜,而群桩的倾斜位于非保守侧。

Abstract:It is common to encounter existing piles during tunnel constructions in congested underground. Although tunnel-soil-pile interaction has attracted much research attention recently, previous studies mainly focused on pile responses due to small-scale tunnel excavation. In this study, three-dimensional centrifuge test is conducted to investigate deformation mechanisms of a pile group due to twin large-scale tunnel excavations. Due to tunneling-induced stress relief, the measured settlement of pile group increases almost linearly with tunneling. A shorter distance between the monitoring point and new tunnel results in larger pile group settlement. Upon completion of a single tunnel excavation, a maximum pile group settlement of 0.23% D (i.e., tunnel diameter) is observed directly above tunnel centerline. After twin tunnel excavations, the maximum pile group settlement is increased to 0.32% D, and the location of the maximum pile group settlement shifts to the centreline between two tunnels. As tunnel face approaches the monitoring section, the existing pile group tilts rapidly toward tunnel face. As tunnel face passes through the monitoring section, tilting of existing pile group is reduced. Obviously, the measured tilting of pile group reaches a maximum value when tunnel face is located directly beneath the monitoring section. This clearly demonstrates three-dimensional deformation mechanisms of pile group due to tunnel excavation. If tunnel excavation is simplified as a two-dimensional problem, tilting of pile group along longitudinal tunnel direction is ignored, which is on unconservative side.

中文标题:
隧道下穿码头群桩基础的离心模型试验研究
Centrifugal Model Test Research on Pile Group Foundation of Tunnel Under Wharf

作者:
张宇亭1,2,安晓宇1,2,,,纪文栋2
Zhang Yuting1,2,An Xiaoyu1,2,,,Ji Wendong2
作者简介:张宇亭,男,1985年生,河南焦作人,博士,高级工程师,主要从事岩土工程地基处理及试验监测方面的研究。E-mail:tkszyt@163.com通讯作者:安晓宇,男,1988年生,天津塘沽人,博士,工程师,主要从事岩土工程地基处理及模型试验方面的研究。E-mail:axyuser@163.com
通讯地址:
1. 天津大学, 天津 300072;    2. 交通运输部天津水运工程科学研究所, 天津 300456
1.TianjinUniversity,Tianjin300072,China;    2.TianjinResearchInstituteforWaterTransportEngineering,M.O.T.,Tianjin300456,China

中图分类号:TU411.99
doi:10.3969/j.issn.1007-2993.2021.01.014
出版物:岩土工程技术
收稿日期:2020-04-28
网络出版日期:2021-07-06
刊出日期:2021-07-06


关键词:码头,隧道,变形,离心模型,沉降
Key words:wharf,tunnel,deformation,centrifugal model,settlement
文档包含图片数量:图片(0)张
文档包含表格数量:表格(0)个

参考文献:

基金项目:
基金项目:    中央级公益性科研院所基本科研业务费专项资金资助(TKS190203)

2025-1-16 20:58 上传
文件大小:
3.95 MB
下载次数:
60
高速下载
【温馨提示】 您好!以下是下载说明,请您仔细阅读:
1、推荐使用360安全浏览器访问本站,选择您所需的PDF文档,点击页面下方“本地下载”按钮。
2、耐心等待两秒钟,系统将自动开始下载,本站文件均为高速下载。
3、下载完成后,请查看您浏览器的下载文件夹,找到对应的PDF文件。
4、使用PDF阅读器打开文档,开始阅读学习。
5、使用过程中遇到问题,请联系QQ客服。

本站提供的所有PDF文档、软件、资料等均为网友上传或网络收集,仅供学习和研究使用,不得用于任何商业用途。
本站尊重知识产权,若本站内容侵犯了您的权益,请及时通知我们,我们将尽快予以删除。
  • 手机访问
    微信扫一扫
  • 联系QQ客服
    QQ扫一扫
2022-2025 新资汇 - 参考资料免费下载网站 最近更新浙ICP备2024084428号
关灯 返回顶部
快速回复 返回顶部 返回列表