摘要:结合工程实例,介绍了水泥土复合管桩抗拔的基本原理和特性。为了便于抗拔承载力及经济效益的对比,在同一场地,试桩方案设计水泥土复合管桩2种桩型共6根,以及钻孔灌注桩2种桩型共5根,对其分别进行单桩抗拔静力载荷试验,通过对试验结果和基桩施工造价的分析后认为,在提供相同抗拔承载力特征值时,水泥土复合管桩上拔位移量是钻孔灌注桩的1/3,而造价仅为钻孔灌注桩的80%;管桩的顶部连接采用张拉机械套筒连接是安全可靠的。采用水泥土复合管桩以达到降低工程投资、提高施工质量和保护环境的目的。
Abstract:According to the real project events, the basic principle and characteristics of uplift Pipe Piles Embedded in Cement Soil (PPECS) were introduced. For comparing the uplifting capacity and economic benefits between the PPECS and Drilling-casting Concrete Reinforced Pile (DCRP), in the same field, 6 piles with 2 types of PPCS, and 5 piles with 2 types of DCRP were constructed and did uplift static load testing to each of them. According to the testing results and the cost of pilling, the conclusions are as follows: at providing the same uplift capacity, the uplift displacement of PPECS is just 1/3 of DCRP, but the cost of a PPECS pile is just 80% of DCRP; Tension Mechanical Sleeve is effective in jointing pipes and foundation. PPECS is good for construction quality and environmental protection, also to be cost-saving.
中文标题:
水泥土复合管桩抗拔设计的探讨
Discussing on Design of Uplift Pipe Precast Pile Embedded in Cement Soil
作者:
甘文爽1,,谢雷雷1,朱勇1,朱旭1,倪伟明2,俞伟刚3,郇盼4,唐恒森4,
Gan Wenshuang1,,Xie Leilei1,Zhu Yong1,Zhu Xu1,Ni Weiming2,Yu Weigang3,Huan Pan4,Tang Hengsen4,
作者简介:甘文爽,男,1992年生,学士,主要研究方向为岩土工程、市政工程施工等。E-mail:787055221@qq.com
通讯地址:
1.上海隧道工程有限公司,上海 200032 2.荣盛新材料(舟山)有限公司,浙江舟山 316032 3.浙江石油化工有限公司,浙江舟山 316021 4.北京荣创岩土工程股份有限公司,北京 100085
1.ShanghaiTunnelEngineeringCo.,Ltd.,Shanghai200032,China 2.Rongshengnewmaterial(Zhoushan)Co.,Ltd.,Zhoushan316032,Zhejiang,China 3.ZhejiangPetroleum&ChemicalCo.,Ltd.,Zhoushan316021,Zhejiang,China 4.BeijingRongchuangGeotechnicalEngineeringCo.,Ltd.,Beijing100085,China
中图分类号:TU 473.1
doi:10.3969/j.issn.1007-2993.2023.06.001
出版物:岩土工程技术
收稿日期:2022-07-29
修回日期:2022-12-02
录用日期:2023-05-06
刊出日期:2023-12-08
关键词:水泥土,预应力混凝土管桩,水泥土复合管桩,钻孔灌注桩,抗拔静载荷试验
Key words:cement soil,prestressed concrete pipe pile,Pipe Pile Embedded in Cement Soil (PPECS),Drilling-casting Concrete Reinforced Pile (DCRP),uplift static load testing
文档包含图片数量:图片(5)张
文档包含表格数量:表格(6)个
参考文献:
[1]宋义仲,程海涛,卜发东,等. 管桩水泥土复合基桩工程应用研究[J]. 施工技术,2012,41(5):89-91,99.
[2]万嘉康,徐云博. 抗拔桩应用与研究现状[J]. 岩土工程界,2008,11(3):50-51.
[3]宋义仲,卜发东,程海涛,等. 水泥土复合管桩竖向抗拔承载机理研究[J]. 施工技术,2017,46(S1):138-141.
[4]王 强,侯小平,李宏儒. 晋江市某工程预应力管桩复合地基设计[J]. 建筑结构,2006,36(4):4-5,18.
[5]王 强,戴 斌. 管桩成桩工艺系数及其承载力的探讨[J]. 建筑结构,2019,49(S1):811-814.
[6]施胜挺,李俊才,陆 忠,等. 管桩水泥土复合基桩抗拔荷载传递规律试验研究[J]. 南京工业大学学报(自然科学版),2017,39(6):124-129,142.
[7]李 蓉,侯天顺. 水泥土搅拌桩及其在软土地基加固中的应用[J]. 建筑科学,2008,24(5):88.
[8]华小龙. 管桩水泥土复合基桩极限承载力研究[D]. 南京: 南京工业大学, 2013.
[9]李俊才,张永刚,邓亚光,等. 管桩水泥土复合桩荷载传递规律研究[J]. 岩石力学与工程学报,2014,33(S1):3068-3076.
[10]JGJ/T 330—2014 水泥土复合管桩基础技术规程[S]. 北京: 中国建筑工业出版社, 2014.
[11]JGJ 94—2008 建筑桩基技术规范[S]. 北京: 中国建筑工业出版社, 2008.
[12]GB 50010—2010 混凝土结构设计规范[S]. 北京: 中国建筑工业出版社, 2011.
[13]JGJ 106—2014 建筑基桩检测技术规范[S]. 北京: 中国建筑工业出版社, 2014.
[14]GB 50007—2002 建筑地基基础设计规范[S]. 北京: 中国建筑工业出版社, 2002.
[15]张忠苗. 桩基工程[M]. 北京: 中国建筑工业出版社, 2007.
基金项目:
- 文件大小:
- 1.91 MB
- 下载次数:
- 60
-
高速下载
|
|