某海相淤泥土层地区钻孔压灌桩基础事故原因分析与加固处理
摘要:针对某海相淤泥土层地区钻孔压灌桩基础出现多数桩身完整性和承载力不满足设计要求的的现象进行分析,发现在新近沉积的海相淤泥土层中进行钻孔压灌桩施工易出现混凝土窜孔、流失等现象,是造成桩身缺陷的主要原因。同时,还探讨如何根据验收检测、扩大检测及设计荷载复核等手段,在现有桩基础承载力得到充分发挥的基础上,对桩基础进行加固处理,从而较大地节省了加固成本。
Abstract:This article analyses the pile foundation which is not qualified for the integrity and bearing capacity by the drill grouting piles test in the marine mucky soil area.The main reason has been found out that the drill grouting piles in marine mucky soil area will lead to concrete excursion and erosion.Meantime,this article also studied how to utilize the current pile foundation bearing capacity via acceptance test,additional test and design load audit,further strengthen the pile foundation and save invest cost.
中文标题:
某海相淤泥土层地区钻孔压灌桩基础事故原因分析与加固处理
Accident Analysis and Reinforce Treatment for Drill Grouting Piles Foundation of Marine Mucky Soil Area
作者:
舒昭然,曹瑞钠,刘忠昌
Shu Zhaoran,Cao Ruina,Liu Zhongchang
作者简介:舒昭然,男,1984年生,汉族,黑龙江哈尔滨人,大学本科,主要从事岩土工程勘察设计施工工作。E-mail:107685560@qq.com
通讯地址:
辽宁省建筑设计研究院岩土工程公司, 辽宁沈阳 110005
LiaoningProvincialBuildingDesignResearchInstituteGeotechnicalEngineeringCompany,Shenyang110005,Liaoning,China
中图分类号:TU473.1
doi:10.3969/j.issn.1007-2993.2018.05.002
出版物:岩土工程技术
收稿日期:2018-05-02
网络出版日期:2021-07-06
关键词:钻孔压灌桩,单桩承载力,桩身完整性,基础加固,海相淤泥土层
Key words:auger drilling grouting pile,individual pile bearing capacity,pile integrity,foundation reinforcement,marine mucky soil
文档包含图片数量:图片(0)张
文档包含表格数量:表格(0)个
参考文献:
基金项目:
- 文件大小:
- 543.45 KB
- 下载次数:
- 60
-
高速下载
|
|